A two-cell cooling-tower shutdown scope covering motor overhaul, 1008 gearbox overhaul, fan/shaft/coupling inspection and drift-eliminator replacement.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Prachuap Khiri Khan, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Overhaul two 55 kW AC motors, including DE/NDE bearings, oil seals, rotor balancing and electrical checks.
Overhaul two 1008 gearboxes with alignment and vibration checks, bearing/seal replacement and gear-condition inspection.
Inspect fan blades, propeller shafts, couplings, fill grid, drift eliminators and spray nozzles.
Replace drift eliminators on two cooling-tower cells.
Engineering focus
The job order ties rotating-equipment overhaul and cooling-tower internals into one five-day shutdown scope, making this a strong example of integrated mechanical maintenance rather than a single-component repair.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.