Replace lubricant, align gearbox/drive shaft/motor and adjust fan pitch/tip clearance.
Correct identified gearbox oil leaks using gasket sealant and epoxy build-up methods.
Engineering focus
This is a fleet-style PM case rather than a single-cell repair, useful for showing repeatable inspection and condition-monitoring capability.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.