Thailand: Eight-Unit Cooling Tower Preventive Maintenance

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Annual preventive maintenance across eight cooling-tower units, integrating vibration spectrum analysis, alignment, lubrication and leak correction.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationThailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Perform vibration spectrum analysis before/after maintenance.
  • Inspect bearings, gear condition and backlash.
  • Replace lubricant, align gearbox/drive shaft/motor and adjust fan pitch/tip clearance.
  • Correct identified gearbox oil leaks using gasket sealant and epoxy build-up methods.

Engineering focus

This is a fleet-style PM case rather than a single-cell repair, useful for showing repeatable inspection and condition-monitoring capability.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.