Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
Adjacent industrial-water project covering removal and installation of tube-settler media in a clarifier tank under confined-space conditions.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Remove the existing tube settler from the clarifier tank.
Install the new tube-settler media.
Perform the work under confined-space controls.
Provide engineering and manpower for removal/clearing of the old media.
Engineering focus
This is not a cooling-tower job. It is published as an adjacent industrial water-treatment engagement that uses Synergy Services’ confined-space and industrial maintenance capability.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.