Songkhla: Three-Cell Cooling Tower PM and Mechanical Replacement
April 17, 2026
Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
Three-cell shutdown scope combining preventive maintenance with motor, gearbox, hub, fan-blade and drive-shaft replacement on one cell and oil-seal replacement on two cells.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Songkhla, Thailand
Source basis
Awarded work order
Publication status
Awarded scope; completion and measured results are not asserted
Source-backed scope
Replace motor, gearbox, hub, fan blade and drive shaft on Cell 2.
Replace high-speed oil seals on two cells.
Perform PM inspection across three cells.
Check fan geometry, laser alignment, vibration, structure and water-distribution components.
Engineering focus
The project is a good shutdown-maintenance example because it combines routine PM with targeted replacement according to cell condition.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.