Songkhla: Three-Cell Cooling Tower PM and Mechanical Replacement
April 17, 2026
Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
Three-cell shutdown scope combining preventive maintenance with motor, gearbox, hub, fan-blade and drive-shaft replacement on one cell and oil-seal replacement on two cells.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Songkhla, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Replace motor, gearbox, hub, fan blade and drive shaft on Cell 2.
Replace high-speed oil seals on two cells.
Perform PM inspection across three cells.
Check fan geometry, laser alignment, vibration, structure and water-distribution components.
Engineering focus
The project is a good shutdown-maintenance example because it combines routine PM with targeted replacement according to cell condition.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.