Songkhla Cooling Tower Fill Replacement

The power-site owner operates the Chana power plant.

In 2023, Synergy Services replaced the fill pack in one cooling tower cell with TCI-C-SHP18/500 fill.

Synergy Services’ broader power-site contracts covered 17 power plants and 218 cooling tower cells in 2018–2019, and 21 power plants and 220 cells in 2022–2023.

The published scope included mechanical checks and adjustment, gearbox overhaul, structure and nozzle inspection, and cleaning fill and drift eliminators.

At a glance

FieldPublished project record
ClientSite identity withheld
Site and industryChana power plant · power generation
Tower type and cellsCooling tower · 1 cell
Design dutyNot published in the project record.
ScopeFill-pack replacement in 1 cooling tower cell
Product installedTCI-C-SHP18/500 film fill
Dates2023
Outage per cellNot published in the project record.
Measured resultNot published in the project record.

 

The problem

What we found

Baseline measurement

Fill selection and why

Execution

Synergy Services replaced the fill pack in one cooling tower cell in 2023.

What was difficult

Verified result

 

Cooling tower fill replacement at the Chana power plant

 

TCI-C-SHP18/500 fill installed at the Chana power site