Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
Reconstruction, protective coating and balancing of a six-blade cooling-tower fan set.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Clean and visually inspect six FRP fan blades.
Repair damaged areas and prepare surfaces for a two-coat epoxy protection system.
Match blade weight and centre of gravity before and after coating.
Remove/reinstall the fan and verify blade condition, pitch, tip clearance, tip track and vibration.
Engineering focus
Unlike a simple repaint, the documented scope includes material repair, weight matching and centre-of-gravity control.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.