Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
DK82-200 gearbox overhaul for Cooling Tower Cell A, including PT inspection, bearing/seal replacement and field reinstallation with alignment and vibration checks.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Sa Kaeo, Thailand
Source basis
Awarded work order
Publication status
Awarded scope; completion and measured results are not asserted
Source-backed scope
Disassemble and clean the gearbox internally and externally.
Inspect internal parts and PT-test low-, intermediate- and high-speed gear teeth.
Replace bearings, oil seals and gasket components.
Reinstall gearbox, fan blade and drive shaft and verify alignment, fan geometry and vibration.
Engineering focus
The project documents both workshop gear work and field installation controls, making it more useful than a spare-parts-only gearbox page.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.