Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
DK82-200 gearbox overhaul for Cooling Tower Cell A, including PT inspection, bearing/seal replacement and field reinstallation with alignment and vibration checks.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Sa Kaeo, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Disassemble and clean the gearbox internally and externally.
Inspect internal parts and PT-test low-, intermediate- and high-speed gear teeth.
Replace bearings, oil seals and gasket components.
Reinstall gearbox, fan blade and drive shaft and verify alignment, fan geometry and vibration.
Engineering focus
The project documents both workshop gear work and field installation controls, making it more useful than a spare-parts-only gearbox page.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.