Rayong: Three-Cell Hydro-Fan PM and Gear Replacement

Synergy Services completed the scope documented below. Measured results are shown only where this page states them.

Three-cell mechanical-maintenance program with Hydro-Fan overhauls on two cells and gear replacement on a third cell.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisContracted work order; completed
Publication statusCompleted scope; measured results are shown only where stated

Source-backed scope

  • Overhaul Hydro-Fan assemblies on two cells, inspecting blades, bearing endplay, shaft fit and runout.
  • Replace bearings, oil seals, O-rings and gaskets; repaint and re-torque.
  • Replace the gear drive on a third cell with pre-work alignment/vibration checks.
  • Perform alignment, leak checks and test runs.

Engineering focus

A multi-cell case showing different maintenance strategies applied according to equipment condition: overhaul where recoverable and replacement where required.

Project status

Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.