Rayong: Three-Cell Hydro-Fan PM and Gear Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Three-cell mechanical-maintenance program with Hydro-Fan overhauls on two cells and gear replacement on a third cell.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Overhaul Hydro-Fan assemblies on two cells, inspecting blades, bearing endplay, shaft fit and runout.
  • Replace bearings, oil seals, O-rings and gaskets; repaint and re-torque.
  • Replace the gear drive on a third cell with pre-work alignment/vibration checks.
  • Perform alignment, leak checks and test runs.

Engineering focus

A multi-cell case showing different maintenance strategies applied according to equipment condition: overhaul where recoverable and replacement where required.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.