← Back to Project Cooling-tower gearbox at cooling-tower TF1 during the overhaul and reinstallation work

Rayong: TF1 Cooling Tower Gearbox Overhaul

Synergy Services completed the scope documented below. Measured results are shown only where this page states them.

Cooling-tower gearbox removal, workshop overhaul and reinstallation with bearing/oil-seal replacement and vibration checks.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisContracted work order; completed
Publication statusCompleted scope; measured results are shown only where stated

Source-backed scope

  • Measure vibration and fan geometry before dismantling.
  • Remove the gearbox for workshop overhaul.
  • Dismantle, clean and PT-test the gearbox; replace bearings and oil seals.
  • Reinstall the overhauled gearbox and conduct post-installation vibration measurement and test run.

Engineering focus

This is a clear end-to-end gearbox service workflow, from baseline measurement through workshop overhaul to field recommissioning.

Project status

Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.