Rayong: TF1 Cooling Tower Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Cooling-tower gearbox removal, workshop overhaul and reinstallation with bearing/oil-seal replacement and vibration checks.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Measure vibration and fan geometry before dismantling.
  • Remove the gearbox for workshop overhaul.
  • Dismantle, clean and PT-test the gearbox; replace bearings and oil seals.
  • Reinstall the overhauled gearbox and conduct post-installation vibration measurement and test run.

Engineering focus

This is a clear end-to-end gearbox service workflow, from baseline measurement through workshop overhaul to field recommissioning.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.