Rayong: Ten-Blade Fan Coating and Hub Fabrication

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Protective refurbishment of ten fan blades combined with fabrication of two new HDGS fan hubs and SUS304 hub fasteners.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Abrade and degrease ten fan blades.
  • Repair material loss with Devcon 11700 ceramic repair putty.
  • Apply two coats of Interzone 954 and statically balance the blades.
  • Fabricate two 1,505 mm-diameter HDGS hubs with SUS304 bolts.

Engineering focus

This case combines refurbishment with fabrication, showing an alternative to replacing the entire fan assembly.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.