One-cell cooling-tower overhaul covering packing and drift-eliminator inspection, fan/hub replacement, alignment, field balancing and mechanical-support restoration.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Rayong, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Inspect packing and drift eliminators.
Record fan angle, tip clearance, tip track, vibration and alignment.
Replace fan hub and fan blades, then reset blade geometry and alignment.
Recoat mechanical supports, inspect spray nozzles and wood structure, and perform field balancing.
Engineering focus
The scope combines inspection, component replacement and fan balancing, providing a useful case study for restoring mechanical condition during a planned cooling-tower outage.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.