Cooling-tower PM inspection across multiple plant blocks covering drive components, structure, fill, nozzles, drift eliminators, fan geometry and alignment.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisContracted work order; completed
Publication statusCompleted scope; measured results are shown only where stated

Source-backed scope

  • Inspect shafts and flexible drive elements.
  • Inspect internal partitions and cooling-tower structure.
  • Inspect PVC fill packs, spray nozzles and drift eliminators.
  • Inspect fan-blade tip clearance/angle and recheck motor-to-gearbox alignment.

Engineering focus

The source lists several block/cell tags but contains a repeated block entry, so this page intentionally avoids publishing a total cell count until the inspection report is reconciled.

Project status

Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.