← Back to Project Technician measuring a cooling tower component during the site inspection

Rayong: Multi-Block Cooling Tower Inspection

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Cooling-tower PM inspection across multiple plant blocks covering drive components, structure, fill, nozzles, drift eliminators, fan geometry and alignment.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRayong, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Inspect shafts and flexible drive elements.
  • Inspect internal partitions and cooling-tower structure.
  • Inspect PVC fill packs, spray nozzles and drift eliminators.
  • Inspect fan-blade tip clearance/angle and recheck motor-to-gearbox alignment.

Engineering focus

The source lists several block/cell tags but contains a repeated block entry, so this page intentionally avoids publishing a total cell count until the inspection report is reconciled.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.