
Rayong: Multi-Block Cooling Tower Inspection
Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
Cooling-tower PM inspection across multiple plant blocks covering drive components, structure, fill, nozzles, drift eliminators, fan geometry and alignment.
Project at a glance
| Item | Project record |
|---|---|
| Customer | Site identity withheld |
| Location | Rayong, Thailand |
| Source basis | Awarded work order |
| Publication status | Awarded scope; completion and measured results are not asserted |
Source-backed scope
- Inspect shafts and flexible drive elements.
- Inspect internal partitions and cooling-tower structure.
- Inspect PVC fill packs, spray nozzles and drift eliminators.
- Inspect fan-blade tip clearance/angle and recheck motor-to-gearbox alignment.
Engineering focus
The source lists several block/cell tags but contains a repeated block entry, so this page intentionally avoids publishing a total cell count until the inspection report is reconciled.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.
