Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
Workshop overhaul of an FD1712 gearbox with clearance recording, PT testing, bearing/oil-seal replacement and no-load testing.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Map Ta Phut, Rayong, Thailand
Source basis
Awarded work order
Publication status
Awarded scope; completion and measured results are not asserted
Source-backed scope
Record gearbox clearances before dismantling.
PT-test shafts and gear teeth.
Replace bearings and oil seals and reset clearances.
Reassemble, conduct a no-load test and repaint the gearbox casing.
Engineering focus
The page can emphasize Synergy’s workshop capability and gearbox experience without publishing the source serial number.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.