Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
Workshop overhaul of an FD1712 gearbox with clearance recording, PT testing, bearing/oil-seal replacement and no-load testing.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Map Ta Phut, Rayong, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Record gearbox clearances before dismantling.
PT-test shafts and gear teeth.
Replace bearings and oil seals and reset clearances.
Reassemble, conduct a no-load test and repaint the gearbox casing.
Engineering focus
The page can emphasize Synergy’s workshop capability and gearbox experience without publishing the source serial number.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.