Ratchaburi: Drift Eliminator Replacement and Two-Cell Cleaning
June 10, 2026
Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
Supply and planned installation of TCI-DE-40/120 drift eliminators on one cell combined with cleaning of fill, structure, fan stack, fan blades and basin across two cells.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Ratchaburi, Thailand
Source basis
Awarded work order
Publication status
Awarded scope; completion and measured results are not asserted
Dismantle the existing drift eliminator and install the new system on one cell.
Wash hanging-grid fill from top and bottom across two cells.
Clean drift eliminator, structure, fan stack, fan blades and basin and remove basin sludge.
Engineering focus
The job order specified a 10-week spare-part lead time. This page therefore presents the awarded/planned scope without asserting installation completion.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.