Ratchaburi: Drift Eliminator Replacement and Two-Cell Cleaning

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Supply and planned installation of TCI-DE-40/120 drift eliminators on one cell combined with cleaning of fill, structure, fan stack, fan blades and basin across two cells.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRatchaburi, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Supply TCI-DE-40/120 blade-type drift eliminators.
  • Dismantle the existing drift eliminator and install the new system on one cell.
  • Wash hanging-grid fill from top and bottom across two cells.
  • Clean drift eliminator, structure, fan stack, fan blades and basin and remove basin sludge.

Engineering focus

The job order specified a 10-week spare-part lead time. This page therefore presents the awarded/planned scope without asserting installation completion.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.