← Back to Project Cooling-tower internals at the Ratchaburi site during drift-eliminator replacement and cleaning work

Ratchaburi: Drift Eliminator Replacement and Two-Cell Cleaning

Synergy Services completed the scope documented below. Measured results are shown only where this page states them.

Supply and installation of TCI-DE-40/120 drift eliminators on one cell combined with cleaning of fill, structure, fan stack, fan blades and basin across two cells.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRatchaburi, Thailand
Source basisContracted work order; completed
Publication statusCompleted scope; measured results are shown only where stated

Source-backed scope

  • Supply TCI-DE-40/120 blade-type drift eliminators.
  • Dismantle the existing drift eliminator and install the new system on one cell.
  • Wash hanging-grid fill from top and bottom across two cells.
  • Clean drift eliminator, structure, fan stack, fan blades and basin and remove basin sludge.

Engineering focus

The job order specified a 10-week spare-part lead time. This page presents the scope as documented in the job order.

Project status

Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.