Planned supply and installation of a composite drive shaft combined with gearbox inspection, alignment and vibration verification.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationRatchaburi, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Supply a composite LRR650.425SS composite drive shaft.
  • Remove the gearbox for inspection and PT testing.
  • Install the gearbox, fan and new drive shaft, then align and reset fan geometry.
  • Check vibration after installation and inspect a neighbouring noisy gearbox cell.

Engineering focus

The job order specified a 9–10 week drive-shaft lead time. This page therefore presents the awarded/planned scope without asserting completion.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.