← Back to Project Natural-draft cooling towers at the Laos coal-fired power plant with scaffolding erected against the shell for fill replacement

Cooling Tower Fill Replacement, Laos

The Laos site is a 1,878 MW coal-fired power station in Laos.

The published project record names TCI-C-29CC fill replacement at the plant during 2021–2024.

At a glance

FieldPublished project record
ClientSite identity withheld
Site and industrythe Laos coal-fired power plant · coal-fired power generation
Tower type and unitsNatural-draft cooling tower units · 3 units
Design dutyNot published in the project record.
ScopeFill-pack replacement in all 3 units; 4 tube-settler tanks at the plant
Product installedTCI-C-29CC film fill
Dates2021–2024
Outage per unitNot published in the project record.
Measured resultNot published in the project record.

 

The problem

What we found

Baseline measurement

Fill selection and why

Execution

Synergy Services replaced fill packs across all three natural-draft cooling tower units between 2021 and 2024.

The company profile also records replacement of four tube-settler tanks at the Laos coal-fired power plant.

What was difficult

Verified result

 

Fill pack replacement at the Laos coal-fired power plant

 

TCI-C-29CC fill at the Laos coal-fired power plant