EGAT Chana Cooling Tower Fill Replacement
Electricity Generating Authority of Thailand (EGAT) operates the Chana power plant.
In 2023, Synergy Services replaced the fill pack in one cooling tower cell with Terra TCI-C-SHP18/500 fill.
Synergy Services’ broader EGAT contracts covered 17 power plants and 218 cooling tower cells in 2018–2019, and 21 power plants and 220 cells in 2022–2023.
The published scope included mechanical checks and adjustment, gearbox overhaul, structure and nozzle inspection, and cleaning fill and drift eliminators.
At a glance
| Field | Published project record |
|---|---|
| Client | Electricity Generating Authority of Thailand (EGAT) |
| Site and industry | Chana power plant · power generation |
| Tower type and cells | Cooling tower · 1 cell |
| Design duty | Not published in the project record. |
| Scope | Fill-pack replacement in 1 cooling tower cell |
| Product installed | Terra TCI-C-SHP18/500 film fill |
| Dates | 2023 |
| Outage per cell | Not published in the project record. |
| Measured result | Not published in the project record. |
The problem
What we found
Baseline measurement
Fill selection and why
Execution
Synergy Services replaced the fill pack in one cooling tower cell in 2023.
What was difficult
Verified result


Related
- Cooling tower parts replacement service
- Terra Cooling Industries fill and components
- Cooling Tower Fill Replacement: How It Saves Energy and Reduces Operating Costs
- Cooling Tower Performance Testing: What It Is and Why It Matters
See the full client list for other clients we work with.