Chonburi: Three-Cell PM and Motor/Gearbox Replacement
March 16, 2026
Synergy Services completed the scope documented below. Measured results are shown only where this page states them.
Three-cell cooling-tower intervention: preventive maintenance on Cells A/B and replacement of the motor and gearbox on Cell C.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Chonburi, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Perform PM on Cells A and B, checking fan geometry, alignment and visible condition of fan/gear/drive shaft, drift eliminator and nozzles.
Record baseline parameters on Cell C.
Remove and reinstall fan blade, gearbox, drive shaft and motor on Cell C.
Reset pitch, tip clearance, tip track, vibration and alignment.
Engineering focus
The source separates routine PM from corrective replacement by cell, useful for explaining condition-based maintenance planning.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.