← Back to Project Mobile crane rigged for lifting beside cryogenic storage tanks at the plant during the maintenance shutdown

Chonburi: Three-Cell PM and Motor/Gearbox Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Three-cell cooling-tower intervention: preventive maintenance on Cells A/B and replacement of the motor and gearbox on Cell C.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationChonburi, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Perform PM on Cells A and B, checking fan geometry, alignment and visible condition of fan/gear/drive shaft, drift eliminator and nozzles.
  • Record baseline parameters on Cell C.
  • Remove and reinstall fan blade, gearbox, drive shaft and motor on Cell C.
  • Reset pitch, tip clearance, tip track, vibration and alignment.

Engineering focus

The source separates routine PM from corrective replacement by cell, useful for explaining condition-based maintenance planning.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.