Chonburi: Three-Cell PM and Motor/Gearbox Replacement
March 16, 2026
Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.
Three-cell cooling-tower intervention: preventive maintenance on Cells A/B and replacement of the motor and gearbox on Cell C.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Chonburi, Thailand
Source basis
Awarded work order
Publication status
Awarded scope; completion and measured results are not asserted
Source-backed scope
Perform PM on Cells A and B, checking fan geometry, alignment and visible condition of fan/gear/drive shaft, drift eliminator and nozzles.
Record baseline parameters on Cell C.
Remove and reinstall fan blade, gearbox, drive shaft and motor on Cell C.
Reset pitch, tip clearance, tip track, vibration and alignment.
Engineering focus
The source separates routine PM from corrective replacement by cell, useful for explaining condition-based maintenance planning.
Project status
Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.