Removal and installation of a cooling-tower gearbox with baseline vibration/alignment measurements, fan inspection and 50-ton crane support.
Project at a glance
Item
Project record
Customer
Site identity withheld
Location
Chachoengsao, Thailand
Source basis
Contracted work order; completed
Publication status
Completed scope; measured results are shown only where stated
Source-backed scope
Measure motor/gearbox vibration before replacement.
Record alignment before and during installation.
Inspect fan-blade pitch angle and tip clearance before/after the gearbox change.
Use a 50-ton mobile crane and confined-space qualified personnel.
Engineering focus
This project adds another gearbox manufacturer to the portfolio and highlights controlled baseline/after measurements during replacement.
Project status
Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.