Chachoengsao: Cooling Tower Gearbox Replacement

Synergy Services completed the scope documented below. Measured results are shown only where this page states them.

Removal and installation of a cooling-tower gearbox with baseline vibration/alignment measurements, fan inspection and 50-ton crane support.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationChachoengsao, Thailand
Source basisContracted work order; completed
Publication statusCompleted scope; measured results are shown only where stated

Source-backed scope

  • Measure motor/gearbox vibration before replacement.
  • Record alignment before and during installation.
  • Inspect fan-blade pitch angle and tip clearance before/after the gearbox change.
  • Use a 50-ton mobile crane and confined-space qualified personnel.

Engineering focus

This project adds another gearbox manufacturer to the portfolio and highlights controlled baseline/after measurements during replacement.

Project status

Scope completed as documented above. This page describes the contracted work; measured results are shown only where the page states them. Images on this page document the work covered by this scope.