Chachoengsao: Cooling Tower Gearbox Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted engagement without claiming completion or measured results unless separate evidence is explicitly stated.

Removal and installation of a cooling-tower gearbox with baseline vibration/alignment measurements, fan inspection and 50-ton crane support.

Project at a glance

ItemProject record
CustomerSite identity withheld
LocationChachoengsao, Thailand
Source basisAwarded work order
Publication statusAwarded scope; completion and measured results are not asserted

Source-backed scope

  • Measure motor/gearbox vibration before replacement.
  • Record alignment before and during installation.
  • Inspect fan-blade pitch angle and tip clearance before/after the gearbox change.
  • Use a 50-ton mobile crane and confined-space qualified personnel.

Engineering focus

This project adds another gearbox manufacturer to the portfolio and highlights controlled baseline/after measurements during replacement.

Project status

Synergy Services was awarded this scope. This page describes contracted work; completion and measured results are not claimed unless explicitly supported. Images on this page document the work covered by the awarded scope.