EGAT Chana Cooling Tower Fill Replacement

Electricity Generating Authority of Thailand (EGAT) operates the Chana power plant. In 2023, Synergy …

#PartReplacement
Natural-draft cooling towers at Hongsa Power Plant with scaffolding erected against the shell for fill replacement

Hongsa Power Plant Cooling Tower Fill Replacement, Laos

Hongsa Power Plant is a 1,878 MW coal-fired power station in Laos. The published project record …

#PartReplacement

SCGC Group Cooling Tower Fill Replacement — 5 Plants, 25 Cells

SCGC Group operates petrochemical plants across Rayong and Map Ta Phut. Between 2021 and 2024, …

#PartReplacement

Zeon Chemicals Asia: Cooling Tower Cleaning and Comparative Performance Test

A Zeon Chemicals Asia service report documents cooling-tower cleaning followed by comparative …

#Maintenance #PerformanceTest
Process structures and pipework at the Thai Oil refinery site covered by the 2026 fin-fan maintenance program

Thai Oil: 2026 Fin-Fan Maintenance Program

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FinFan
Existing gearbox on MCLS Asia cooling tower CT 917A before replacement

MCLS Asia CT 917A: Cooling Tower Gearbox Replacement and Mechanical Verification

The service report for MCLS Asia cooling tower CT 917A documents a controlled gearbox replacement …

#Maintenance #GearboxReplacement
Cooling-tower gearbox and motor drive at PPP Green Complex during the two-cell overhaul

PPP Green Complex: Two-Cell Motor, Gearbox and Drift Eliminator Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul #DriftEliminator
Cooling-tower cell at Covestro Plant 2 covered by the mechanical overhaul and fan replacement

Covestro Plant 2: Cooling Tower Mechanical Overhaul and Fan Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanReplacement
Cooling-tower reduction gear and hub disc at HMC Polymers PDH during the drive replacement

HMC Polymer PDH: Reduction Gear and Hub Disc Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxReplacement
Cooling-tower gearbox at IRPC TF1 during the overhaul and reinstallation work

IRPC TF1: Cooling Tower Gearbox Overhaul and Reinstallation

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul
Cooling-tower drive shaft at Prasat, Surin during the coating and alignment work

Prasat, Surin: Amarillo Composite Drive Shaft Coating and Alignment

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #DriveShaft
Cooling-tower Hydro-Fan assembly at UBE Chemicals during the three-cell maintenance program

UBE Chemicals: Three-Cell Hydro-Fan Overhaul and Gear Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #HydroFan #GearboxReplacement
Cooling-tower gearbox at Amata B.Grimm Power 1 during the Cell 1 replacement work

Amata B.Grimm Power 1: Cooling Tower Gearbox Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxReplacement
Technician working on the top deck of a cooling-tower cell at Cool Connext, beside the water-distribution header and fill packs

Cool Connext: Annual Preventive Maintenance Across Eight Cooling Tower Units

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #ConditionMonitoring
Amarillo 1110 cooling-tower gearbox during the workshop overhaul for Mitr Phol

Mitr Phol: Amarillo 1110 Cooling Tower Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul
Cofimco FRP cooling-tower fan set at Mitr Phol during the reconstruction and balancing work

Mitr Phol: Cofimco FRP Fan Blade Reconstruction and Balancing

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanRefurbishment
Cooling-tower gearbox at Advance Agro Asia during the MATRIX gearbox replacement

Advance Agro Asia: MATRIX Cooling Tower Gearbox Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxReplacement
Technicians installing blue tube-settler modules inside a clarifier tank

BST ENEOS Elastomer: Clarifier Tube Settler Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#WaterTreatment #Maintenance
Amarillo 1712 gear shaft being checked with dial indicators in Synergy's workshop

AGC Vinythai: Amarillo FD1712 Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul
Dial-indicator measurement during an Air Liquide Amarillo gearbox overhaul

Air Liquide Thailand: Amarillo 110 Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul
Mobile crane rigged for lifting beside cryogenic storage tanks at the Air Liquide Thailand plant during the maintenance shutdown

Air Liquide Thailand: Two-Cell PM and Cell-C Motor/Gearbox Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxReplacement #MotorReplacement
Cooling tower gearbox maintenance for PTTGC

PTTGC Cooling Tower Gearbox Maintenance and Fan Setup

Synergy Services carried out corrective and preventive mechanical work on a PTTGC cooling-tower fan …

#Maintenance #PerformanceTest
Dissan DK82-200 cooling-tower gearbox at Green Power 2 during the overhaul and reinstallation

Green Power 2: Dissan DK82-200 Gearbox Overhaul and Reinstallation

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxOverhaul
BAC stainless-steel evaporative condenser during factory acceptance inspection for Linde Thailand

Linde Thailand: BAC Stainless-Steel Evaporative Condenser Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Upgrade #EvaporativeCondenser
Corroded cooling-tower fan hub disc and clamp ring removed at Ayutthaya Industrial Gas, laid out before refurbishment and coating

Ayutthaya Industrial Gas: Two-Set Cofimco Fan Blade Coating

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanRefurbishment
Covestro cooling tower fan blade being measured before refurbishment

Covestro: Ten-Blade Fan Coating and New Hub Fabrication

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanRefurbishment #Fabrication
Cooling-tower fill and drift eliminator at Thai Oil during the Q4708 replacement program

Thai Oil: Q4702, Q4704 and Q4708 Fill & Drift Eliminator Replacement Program

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FillReplacement #DriftEliminator
Technician measuring a cooling tower component during the IRPC Clean Power inspection

IRPC Clean Power: Multi-Block Cooling Tower Mechanical and Internal Inspection

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Inspection #Maintenance
Open cooling-tower drive gearbox at Songkhla Biomass showing the bevel and helical gear set inside the housing during inspection

Songkhla Biomass: Three-Cell Cooling Tower PM and Mechanical Replacement

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #GearboxReplacement #FanReplacement
Drift eliminator installation inside PPPC cooling tower ET2

PPPC ET2: Cooling Tower FRP Structure Repair and Drift Eliminator Replacement

The final service workbook for Phoenix Pulp And Paper Public Company Limited documents repair work …

#Maintenance #PartReplacement #StructureRepair
Cooling-fan motor and Dissan gearbox at Ratchaburi-EEP during the overhaul

Ratchaburi-EEP: Cooling Fan Motor and Dissan Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #MotorOverhaul #GearboxOverhaul
Concrete cooling tower at the Suphan Buri bioenergy plant

Suphan Buri Bioenergy Plant: Amarillo FD1110 Cooling Tower Gearbox Overhaul

Synergy Services overhauled an Amarillo FD1110 speed reducer serving a large cooling-tower fan at a …

#Maintenance #GearboxOverhaul
Cooling-tower fan and drive at Siam City Power SDK6 during the mechanical overhaul

Siam City Power: SDK6 Fan Replacement, Blade Coating and Gearbox Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanReplacement #GearboxOverhaul
Cooling-fan gear unit and motor at Ubon Bio Ethanol during the Cell D overhaul

Ubon Bio Ethanol: Cooling Fan Gear and Four-Motor Overhaul

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #MotorOverhaul #GearboxOverhaul

TPIPL: AFI SmartFan Upgrade for Three Cooling Tower Cells

TPI Polene’s 2026 work order specifies three AFI SmartFan sets for a cooling-tower fan …

#Upgrade
Cooling tower fan and structure at the AGC Pluak Daeng site

AGC Flat Glass Pluak Daeng: Cooling Tower Vibration Spectrum Analysis

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Inspection #ConditionMonitoring
Cooling tower component replacement work inside IRPC Cell D

IRPC Lube Plant: Cooling Tower Fill Replacement and Performance Restoration

Synergy Services replaced spray nozzles, fill packs and drift eliminators on IRPC cooling tower …

#PartReplacement #PerformanceTest
BBGI Bio Diesel industrial facility at Bo Phloi, Kanchanaburi

BBGI Bio Diesel: 12-Cell Cooling Tower Performance and Airflow Assessment

Synergy Services carried out a performance and airflow assessment covering 12 cooling-tower cells …

#PerformanceTest
Cooling-tower internals at Rajburi Sugar during drift-eliminator replacement and cleaning work

Rajburi Sugar: Terra Drift Eliminator Replacement and Two-Cell Cleaning

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #DriftEliminator #Cleaning
Concrete cooling tower at Rajburi Sugar seen from ground level, with riser pipework, valves and circulating pump alongside the air-inlet openings

Rajburi Sugar: Rexnord Addax Drive Shaft Replacement and Gearbox Inspection

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #DriveShaft #GearboxInspection

Recovery House: Gearbox 1008 Overhaul, HVOF Shaft Repair and Fan Refurbishment

Synergy Services was awarded a 2026 work package for Recovery House Co., Ltd. combining gearbox …

#Maintenance #GearboxOverhaul
Cooling tower drive-train work at Kanchanaburi Bio-Energy

Kanchanaburi Bio-Energy: Cooling Tower Drive Shaft and Gearbox Replacement

A July 2026 service report for Kanchanaburi Bio-Energy Company Limited documents drive-train work …

#Maintenance #PartReplacement
Completed blue-coated FRP cooling tower fan blades for Angvian Industry

Angvian Industry: FRP Fan Blade, Hub and Root-Cap Refurbishment

Synergy Services was awarded the scope documented below. This page presents the contracted …

#Maintenance #FanRefurbishment

KSL Tha Maka: AFI Fan Upgrade for Two Cooling Tower Cells

The 2026 work order for KSL Tha Maka specifies two AFI fan sets and installation on two …

#Upgrade

Buriram Sugar: AFI SmartFan Upgrade for Two Cooling Tower Cells

Buriram Sugar’s work order specifies two AFI FRP fan sets for a cooling-tower upgrade. Design …

#Upgrade