Company profile · 2026

Synergy Services Co., Ltd.

Established in 2006 and based in Bangkok, Synergy Services provides industrial cooling tower services across Thailand and the region. The company operates an ISO 9001:2015-certified quality management system and is a member of the Cooling Technology Institute (CTI).

Technicians lifting a cooling tower gearbox under the Synergy Overhaul Gear Service gantry

Contents

  1. About usMilestones · Offices and workshops · Quality
  2. ProductsPartners · Product groups · Innovations
  3. ServicesService lines · Long-term contracts · Air-cooled maintenance
  4. Project referenceNew towers · Replacement projects · Green initiatives

About us

MilestonesOffices and workshopsQuality

Company background

Technicians rigging cooling tower fan and gearbox components during maintenance

Synergy Services Company Limited has been recognized as a full-range service provider for all cooling tower owners and businesses. Designing, upgrading, and replacing cooling towers has been our expertise since 2006. In recent years, our services have expanded beyond cooling towers to include inspections and performance testing solutions for various industries, including petrochemical, chemical, sugar, pulp and paper, cement, and power generation.

Registered as บริษัท ซินเนอร์ยีเซอร์วิส จำกัด (Synergy Services Co., Ltd), juristic person registration number 0105549045965.

Visit our head office and workshops in Bangkok, Rayong, and Khon Kaen, or see the full list of our clients across Thai and regional industry.

Milestones since 2006

  • 2006 — Established and represented Terra Cooling Industries
  • 2009 — Opened workshop facility in Rayong
  • 2010 — Represented D'Hondt Thermal Solutions
  • 2015 — Became an authorised Amarillo Gear supplier

Milestones 2018–2026

  • 2018 — Expanded onto company-owned land in Rayong, added a gearbox overhaul station, and began representing Brentwood Industries
  • 2019 — Completed an overseas project in Laos
  • 2022 — Diversified into new business
  • 2023 — Represented Baltimore Aircoil Company and AFI
  • 2026 — Opened overhaul gear station in Khon Kaen

Three locations in Thailand

Entrance of the Synergy Services Khon Kaen overhaul workshop, with the Synergy Services Workshop sign

  • Bangkok head office — 22/44 H-Cape Biz Sector, Sukhaphiban 2 Rd., Prawet, Prawet District, Bangkok 10250
  • Rayong workshop — 888/10, Moo 2, Phana Nikhom, Nikhom Phatthana, Rayong 21180
  • Khon Kaen workshop — 371, Bueng Niam, Mueang Khon Kaen, Khon Kaen 40000

Two dedicated overhaul workshops

Synergy Services’ Rayong workshop, home to a dedicated gearbox overhaul station opened in 2018

The Rayong and Khon Kaen sites are purpose-built overhaul workshops, not just service points. Rayong added a dedicated gearbox overhaul station in 2018; Khon Kaen opened with the same capability in 2026, extending overhaul coverage into Northeast Thailand. Three internal teams carry out the work each site produces — a Shutdown team, a Long Term team, and an Overhaul team — each with its own senior engineers, service engineers, supervisors, and foremen.

Quality and professional membership

Our credentials state what clients can verify: the quality-management certification held by Synergy Services and the professional institute whose procedures guide our performance testing.

Our Commitment to Quality 

With 20 years of experience, we are a member of the Cooling Technology Institute (CTI), which advocates and promotes the use of environmentally responsible evaporative heat transfer systems and cooling towers. Our performance testing follows CTI procedures, and we supply CTI-certified products where a project calls for them. Additionally, our quality management system’s ability to meet customer and regulatory requirements is proven by ISO 9001 certification — certificate 9940, issued by Peers Quality Assurance Ltd under UKAS accreditation. CTI’s member directory is public and lists Synergy Services Co., Ltd.

Cooling Technology Institute member logo

Cooling Technology Institute

Member. Performance testing follows CTI procedures, and we supply CTI-certified products where a project calls for them.

ISO 9001:2015 certification mark, certificate 9940, UKAS accredited

ISO 9001:2015

Certificate 9940, issued by Peers Quality Assurance Ltd and accredited by UKAS.

Products

PartnersProduct groupsInnovations

Manufacturing partner

Collaboration, rental and plant-utility partners

Three cooling tower product groups

Mechanical Parts

Mechanical drive components

  • Gearbox or Gear

    Transfers motor power to the fan at the required speed and torque; selection is matched to duty, ratio, mounting, shaft arrangement and operating environment.

  • Fan Assembly

    Hub, blades and related hardware move air through the tower; support includes inspection, balancing, pitch and tip-clearance setup, replacement and commissioning.

  • Drive Shaft

    Transmits power between motor and gearbox; supply and installation can include couplings, alignment and vibration checks.

Overhauled right-angle cooling tower gearbox on a pallet with its drive-shaft coupling fitted
Gearbox
Cooling tower fan assembly mounted on its hub inside the tower during installation
Fan assemblies
Cooling tower drive shaft with its machined coupling flange, orange warning label and guard rail on the fan deck
Drive shaft

Static Parts

Water and air contact components

  • Fill or Fill Media

    Creates the contact surface for heat exchange between circulating water and air; film, splash and other configurations suit different tower, water and fouling conditions.

  • Drift Eliminator

    Captures water droplets carried by leaving air; selection considers airflow, pressure drop, drift-loss requirement, material and support arrangement.

  • Nozzle

    Distributes circulating water across the fill; pattern, flow, pressure, connection and material are matched to the required coverage.

Two cooling tower fill types side by side: film fill installed in a casing on the left, stacked honeycomb trickle fill packs on the right
Fill media
Bundled blade-profile cooling tower drift eliminator sections staged for delivery
Drift eliminators
Two blue cooling tower water-distribution headers with black spray-nozzle assemblies above dark fill media
Water-distribution nozzles

Structure and Accessories

FRP support and access scope

  • Frame and bracing

    Columns, beams and braces form the tower's structural support system.

  • Component supports

    Internal supports carry casing and cooling-tower components.

  • Maintenance access

    Platforms, walkways, handrails and ladders provide access for inspection and service.

White-painted cooling tower structural frame under construction with columns, beams and diagonal bracing
Frame and bracing
Internal frame supporting cooling tower fan and drive components
Component supports
Industrial cooling equipment maintenance walkway and access door
Maintenance access

Service innovations

Beyond the four core service lines, we install and support three manufacturer programmes.

BAC’s Endura Drive is a direct-drive system for Series 3000 cooling towers that removes the gearbox and belt from the powertrain entirely. With no gear or belt to inspect, test, or replace, it lowers maintenance cost, and more than 500 units are installed worldwide.

Technicians conducting cooling tower performance testing at an industrial plant

CTP’s chemical cleaning lines address three parts of a plant: Neutrol® for offline cleaning of heater and boiler tubes during shutdowns, Neutramex® for online fireside cleaning of heaters and boilers on convection and radiant banks, and Decamex® for on-line or off-line air-side cleaning of air coolers and condensers without scaffolding or plenum entry. All three are biodegradable and non-hazardous. CTP also supplies mobile wastewater treatment — temporary, modular, fully automated systems for commissioning, shutdown, maintenance, and emergency projects that keep a plant in environmental compliance without extending downtime.

Services

Service linesLong-term contractsAir-cooled maintenance

Four cooling tower service lines

Inspection and performance testing

Cooling tower inspection and performance testing in Thailand

Cooling tower performance testing in Thailand (CTI ATC-105): we measure range, approach and airflow to find lost capacity.

  • Cooling tower thermal performance evaluation (CTI-standard)
  • Airflow and fan performance analysis
  • Water distribution uniformity check
  • Vibration analysis on rotating equipment

Overhaul and maintenance

Cooling tower gearbox opened for overhaul in Thailand, showing the bevel ring gear and pinion bearing

Cooling tower gearbox, drive-shaft and fan overhaul in Thailand — the documented repair sequence, real findings, and what you receive at handover.

  • Scheduled inspections aligned to your plant’s planned shutdown calendar
  • Gearbox and motor overhaul
  • Fan blade replacement and rebalancing
  • High-pressure cleaning of fill, basin, and distribution headers

Parts replacement

Cooling tower spare parts replacement in Thailand

Cooling tower fill, drift eliminator and fan blade replacement in Thailand — a measured example of what recovered performance looks like, and typical payback.

  • Fill replacement
  • Drift eliminator replacement
  • Fan blade replacement
  • Bearings and oil seals
  • Motor mounts, casing panels and basin liners

Upgrade and reconstruction

Cooling tower upgrade and reconstruction in Thailand

Cooling tower upgrade and reconstruction in Thailand — engineered retrofits and rebuilds, sized from a measured baseline, not a guess.

  • Fan and drive system upgrade to variable frequency drives (VFD)
  • Water distribution system redesign for improved uniformity
  • Basin enlargement and additional cells
  • Complete casing, basin, and fill replacement with modern materials (FRP or concrete)

New cooling towers

We design and build new cooling towers, install them on your site and test them at handover. Every tower is sized and quoted per project.

  • FRP counterflow — air rises against the falling water and meets the coldest water on the way out, so the fill is used efficiently.
  • FRP crossflow — air crosses the falling water horizontally, with gravity water distribution and fill you can reach from outside the cell.
  • Concrete — chosen where decreased fire risk and, for larger structures, higher load-carrying capacity justify its higher first cost.
  • Package — assembled at the factory and delivered in as few sections as transport allows, so there is less work on site.

Built for industrial uptime

  • 3 — Thailand locations
  • 2 — Overhaul workshops
  • 100+ — Approved vendor lists
Inspect → Repair → Verify

One engineering team connects condition assessment, workshop overhaul, component replacement and post-work checks.

Reference clients across heavy industry

Synergy Services is on the approved vendor lists of more than 100 companies. The company profile identifies work across these sectors:

  • Petrochemical
  • Power generation
  • Oil and gas
  • Food and beverage
  • Biomass
  • Cement
  • Steel
  • Pulp and paper

Long-term power and petrochemical contracts at scale

Aerial view of a power station complex with blue-roofed buildings

  • Power-sector contract, 2018–2019 — 17 power plants and 218 cooling tower cells under a two-year contract.
  • Power-sector contract, 2022–2023 — 21 power plants and 220 cooling tower cells under a two-year contract.
  • Power-sector contract, 2020–2021 — cooling tower work across five power plants.
  • Power-sector contract, 2022–2028 — cooling tower work across 17 power plants.

The stated scope for these power-sector contracts covers mechanical checks and adjustment, gearbox overhaul, structure and nozzle inspection, and cleaning of fill and drift eliminators.

Synergy Services also holds a price-list contract with a petrochemical group, 2022–2025, covering seven plants.

Air-cooled equipment maintenance at scale

Refinery process columns and piping under a blue sky

  • Thai Oil PCL, November 2023–November 2026 — 600 Fin Fan units, with maintenance at three-month, six-month, and annual intervals.
  • Trans Thai-Malaysia (Thailand), 2017–2020 — preventive and corrective maintenance for 60 air-cooled heat exchanger (ACHE) fans.
  • Trans Thai-Malaysia (Thailand), 2025–2026 — a one-year preventive-maintenance contract covering 60 ACHE fans.
  • 2025–2026 contract — preventive and corrective maintenance covering 814 units over two years.

Project reference

New towersReplacement projectsGreen initiatives

New towers and reconstruction

A cooling tower steel frame under construction beside a crane

  • TRR Group — 36 new FRP counterflow cooling tower cells: 16 at Wang Muang, 10 at Bung Samphan, and 10 at Sabot.
  • Thai Asia Pacific Brewery Co., Ltd. — one evaporative condenser removed and replaced.

Selected replacement projects

  • Scaffolding on the shell of a natural-draft cooling tower Coal-fired power station, Laos — a 1,878 MW facility using three natural-draft cooling tower units; four tube-settler tanks were replaced.
  • Technicians fitting blue tube-settler modules inside a clarifier tank Bioindustrial facility, Thailand — two tube-settler tanks were replaced.

Green initiatives in action — 2025

Solar panels on a green industrial roof, seen from above

  • 20 kWp solar power system installed at the Rayong workshop.
  • Solar power system installed at the Bangkok head office.
  • 22,847 units per year of clean energy in the first year.
  • 8.38 tonnes of CO2 per year in stated emissions reduction, equivalent to planting 11 trees per year.
  • Paperless solutions and a company green policy.

Contact Synergy Services

Plan your next cooling tower project.

Send us the tower type, operating duty and current issue. We will help define the inspection, repair or upgrade path.

Synergy Services operates an ISO 9001:2015-certified quality management system and is a member of the Cooling Technology Institute (CTI).

Phone: 02-054-1402
Email: sales@synergyservices.co.th
Web: synergyservices.co.th

Contact our team · View / download corporate brochure · Download full company profile (PDF)

Scan for current details synergyservices.co.th/about/