About us
MilestonesOffices and workshopsQuality
Company background

Synergy Services Company Limited has been recognized as a full-range service provider for all cooling tower owners and businesses. Designing, upgrading, and replacing cooling towers has been our expertise since 2006. In recent years, our services have expanded beyond cooling towers to include inspections and performance testing solutions for various industries, including petrochemical, chemical, sugar, pulp and paper, cement, and power generation.
Registered as บริษัท ซินเนอร์ยีเซอร์วิส จำกัด (Synergy Services Co., Ltd), juristic person registration number 0105549045965.
Visit our head office and workshops in Bangkok, Rayong, and Khon Kaen, or see the full list of our clients across Thai and regional industry.
Milestones since 2006
- 2006 — Established and represented Terra Cooling Industries
- 2009 — Opened workshop facility in Rayong
- 2010 — Represented D'Hondt Thermal Solutions
- 2015 — Became an authorised Amarillo Gear supplier
Milestones 2018–2026
- 2018 — Expanded onto company-owned land in Rayong, added a gearbox overhaul station, and began representing Brentwood Industries
- 2019 — Completed an overseas project in Laos
- 2022 — Diversified into new business
- 2023 — Represented Baltimore Aircoil Company and AFI
- 2026 — Opened overhaul gear station in Khon Kaen
Three locations in Thailand

- Bangkok head office — 22/44 H-Cape Biz Sector, Sukhaphiban 2 Rd., Prawet, Prawet District, Bangkok 10250
- Rayong workshop — 888/10, Moo 2, Phana Nikhom, Nikhom Phatthana, Rayong 21180
- Khon Kaen workshop — 371, Bueng Niam, Mueang Khon Kaen, Khon Kaen 40000
Two dedicated overhaul workshops

The Rayong and Khon Kaen sites are purpose-built overhaul workshops, not just service points. Rayong added a dedicated gearbox overhaul station in 2018; Khon Kaen opened with the same capability in 2026, extending overhaul coverage into Northeast Thailand. Three internal teams carry out the work each site produces — a Shutdown team, a Long Term team, and an Overhaul team — each with its own senior engineers, service engineers, supervisors, and foremen.
Quality and professional membership
Our credentials state what clients can verify: the quality-management certification held by Synergy Services and the professional institute whose procedures guide our performance testing.
Our Commitment to Quality
With 20 years of experience, we are a member of the Cooling Technology Institute (CTI), which advocates and promotes the use of environmentally responsible evaporative heat transfer systems and cooling towers. Our performance testing follows CTI procedures, and we supply CTI-certified products where a project calls for them. Additionally, our quality management system’s ability to meet customer and regulatory requirements is proven by ISO 9001 certification — certificate 9940, issued by Peers Quality Assurance Ltd under UKAS accreditation. CTI’s member directory is public and lists Synergy Services Co., Ltd.

Cooling Technology Institute
Member. Performance testing follows CTI procedures, and we supply CTI-certified products where a project calls for them.

ISO 9001:2015
Certificate 9940, issued by Peers Quality Assurance Ltd and accredited by UKAS.

Products
PartnersProduct groupsInnovations
Represented partners
Terra Cooling Industries
Brentwood Industries
Baltimore Aircoil Company (BAC)
Axial Fans Int srl (AFI)
D’Hondt Thermal Solutions
Authorised suppliers
Manufacturing partner
Collaboration, rental and plant-utility partners
Three cooling tower product groups

Mechanical Parts — gearbox or gear, fan assembly, and drive shaft.

Static Parts — fill or fill media, drift eliminator, and nozzle.

Structure and Accessories — FRP structure and accessories for repair, replacement, upgrade, and reconstruction.
Mechanical Parts
Mechanical drive components
Gearbox or Gear
Transfers motor power to the fan at the required speed and torque; selection is matched to duty, ratio, mounting, shaft arrangement and operating environment.
Fan Assembly
Hub, blades and related hardware move air through the tower; support includes inspection, balancing, pitch and tip-clearance setup, replacement and commissioning.
Drive Shaft
Transmits power between motor and gearbox; supply and installation can include couplings, alignment and vibration checks.



Static Parts
Water and air contact components
Fill or Fill Media
Creates the contact surface for heat exchange between circulating water and air; film, splash and other configurations suit different tower, water and fouling conditions.
Drift Eliminator
Captures water droplets carried by leaving air; selection considers airflow, pressure drop, drift-loss requirement, material and support arrangement.
Nozzle
Distributes circulating water across the fill; pattern, flow, pressure, connection and material are matched to the required coverage.



Structure and Accessories
FRP support and access scope
Frame and bracing
Columns, beams and braces form the tower's structural support system.
Component supports
Internal supports carry casing and cooling-tower components.
Maintenance access
Platforms, walkways, handrails and ladders provide access for inspection and service.



Service innovations
Beyond the four core service lines, we install and support three manufacturer programmes.
BAC’s Endura Drive is a direct-drive system for Series 3000 cooling towers that removes the gearbox and belt from the powertrain entirely. With no gear or belt to inspect, test, or replace, it lowers maintenance cost, and more than 500 units are installed worldwide.

CTP’s chemical cleaning lines address three parts of a plant: Neutrol® for offline cleaning of heater and boiler tubes during shutdowns, Neutramex® for online fireside cleaning of heaters and boilers on convection and radiant banks, and Decamex® for on-line or off-line air-side cleaning of air coolers and condensers without scaffolding or plenum entry. All three are biodegradable and non-hazardous. CTP also supplies mobile wastewater treatment — temporary, modular, fully automated systems for commissioning, shutdown, maintenance, and emergency projects that keep a plant in environmental compliance without extending downtime.

Services
Service linesLong-term contractsAir-cooled maintenance
Four cooling tower service lines
- Inspection and performance testing — Mechanical inspection, airflow and thermal measurement for evidence-based maintenance decisions.
- Overhaul and maintenance — Preventive and corrective work for fans, gearboxes, drives and static tower components.
- Parts replacement — Supply and installation of fill, drift eliminators, nozzles, fans and structural components.
- Upgrade and reconstruction — Engineering redesign to restore performance, expand capacity and extend cooling-tower service life.
Inspection and performance testing

Cooling tower performance testing in Thailand (CTI ATC-105): we measure range, approach and airflow to find lost capacity.
- Cooling tower thermal performance evaluation (CTI-standard)
- Airflow and fan performance analysis
- Water distribution uniformity check
- Vibration analysis on rotating equipment
Overhaul and maintenance

Cooling tower gearbox, drive-shaft and fan overhaul in Thailand — the documented repair sequence, real findings, and what you receive at handover.
- Scheduled inspections aligned to your plant’s planned shutdown calendar
- Gearbox and motor overhaul
- Fan blade replacement and rebalancing
- High-pressure cleaning of fill, basin, and distribution headers
Parts replacement

Cooling tower fill, drift eliminator and fan blade replacement in Thailand — a measured example of what recovered performance looks like, and typical payback.
- Fill replacement
- Drift eliminator replacement
- Fan blade replacement
- Bearings and oil seals
- Motor mounts, casing panels and basin liners
Upgrade and reconstruction

Cooling tower upgrade and reconstruction in Thailand — engineered retrofits and rebuilds, sized from a measured baseline, not a guess.
- Fan and drive system upgrade to variable frequency drives (VFD)
- Water distribution system redesign for improved uniformity
- Basin enlargement and additional cells
- Complete casing, basin, and fill replacement with modern materials (FRP or concrete)
New cooling towers
We design and build new cooling towers, install them on your site and test them at handover. Every tower is sized and quoted per project.
- FRP counterflow — air rises against the falling water and meets the coldest water on the way out, so the fill is used efficiently.
- FRP crossflow — air crosses the falling water horizontally, with gravity water distribution and fill you can reach from outside the cell.
- Concrete — chosen where decreased fire risk and, for larger structures, higher load-carrying capacity justify its higher first cost.
- Package — assembled at the factory and delivered in as few sections as transport allows, so there is less work on site.


Built for industrial uptime
- 3 — Thailand locations
- 2 — Overhaul workshops
- 100+ — Approved vendor lists
One engineering team connects condition assessment, workshop overhaul, component replacement and post-work checks.
Reference clients across heavy industry
Synergy Services is on the approved vendor lists of more than 100 companies. The company profile identifies work across these sectors:
- Petrochemical
- Power generation
- Oil and gas
- Food and beverage
- Biomass
- Cement
- Steel
- Pulp and paper






Long-term power and petrochemical contracts at scale

- Power-sector contract, 2018–2019 — 17 power plants and 218 cooling tower cells under a two-year contract.
- Power-sector contract, 2022–2023 — 21 power plants and 220 cooling tower cells under a two-year contract.
- Power-sector contract, 2020–2021 — cooling tower work across five power plants.
- Power-sector contract, 2022–2028 — cooling tower work across 17 power plants.
The stated scope for these power-sector contracts covers mechanical checks and adjustment, gearbox overhaul, structure and nozzle inspection, and cleaning of fill and drift eliminators.
Synergy Services also holds a price-list contract with a petrochemical group, 2022–2025, covering seven plants.
Air-cooled equipment maintenance at scale

- Thai Oil PCL, November 2023–November 2026 — 600 Fin Fan units, with maintenance at three-month, six-month, and annual intervals.
- Trans Thai-Malaysia (Thailand), 2017–2020 — preventive and corrective maintenance for 60 air-cooled heat exchanger (ACHE) fans.
- Trans Thai-Malaysia (Thailand), 2025–2026 — a one-year preventive-maintenance contract covering 60 ACHE fans.
- 2025–2026 contract — preventive and corrective maintenance covering 814 units over two years.

Project reference
New towersReplacement projectsGreen initiatives
New towers and reconstruction

- TRR Group — 36 new FRP counterflow cooling tower cells: 16 at Wang Muang, 10 at Bung Samphan, and 10 at Sabot.
- Thai Asia Pacific Brewery Co., Ltd. — one evaporative condenser removed and replaced.
Selected replacement projects
Coal-fired power station, Laos — a 1,878 MW facility using three natural-draft cooling tower units; four tube-settler tanks were replaced.
Bioindustrial facility, Thailand — two tube-settler tanks were replaced.
Fill, drift eliminator and structure

Cooling Tower Cell D Fill Replacement and Performance Assessment
Before-and-after performance and airflow verification following fill, nozzle and drift-eliminator replacement on the cooling tower Cell D.

Q4702, Q4704 and Q4708 Fill & Drift Eliminator Replacement Program
Archive-backed program covering three separate 2026 job folders for fill and drift-eliminator replacement on Q4702, Q4704 and Q4708.

Ratchaburi: Drift Eliminator Replacement and Two-Cell Cleaning
Supply and installation of TCI-DE-40/120 drift eliminators on one cell combined with cleaning of fill, structure, fan stack, fan blades and basin across two cells.

ET2 Cooling Tower Structure Repair and Drift Eliminator Replacement
FRP support repair, grid-fill support work, drift-eliminator replacement and internal cleaning on the pulp-and-paper site cooling tower ET2.
Gearbox replacement

Chachoengsao: Cooling Tower Gearbox Replacement
Removal and installation of a cooling-tower gearbox with baseline vibration/alignment measurements, fan inspection and 50-ton crane support.

Chonburi: Cooling Tower Gearbox Replacement
Cooling-tower Cell 1 gearbox replacement with a 60-ton mobile crane, baseline alignment/fan measurements, oil service, recommissioning and vibration checks.

CT 917A Cooling Tower Gearbox Replacement
Cooling tower CT 917A gearbox replacement with vibration, alignment and fan-geometry checks for the site.

Map Ta Phut: Reduction Gear and Hub Disc Replacement
Cooling-tower drive-system intervention replacing the reduction gear and hub disc with fan reassembly, coupling alignment and test run.
Gearbox overhaul

1110 Cooling Tower Gearbox Overhaul
Workshop overhaul and field reinstallation of a Model 1110 cooling-tower gearbox for Refine No.6.

Rayong: FD1712 Gearbox Overhaul
Workshop overhaul of an FD1712 gearbox with clearance recording, PT testing, bearing/oil-seal replacement and no-load testing.

Sa Kaeo: DK82-200 Gearbox Overhaul
DK82-200 gearbox overhaul for Cooling Tower Cell A, including PT inspection, bearing/seal replacement and field reinstallation with alignment and vibration checks.

Suphan Buri: FD1110 Gearbox Overhaul
Controlled removal, workshop overhaul, reinstallation and alignment of an FD1110 cooling-tower gearbox at a Suphan Buri bioenergy plant.
Fan blades

Ayutthaya: Two-Set FRP Fan Blade Coating
Refurbishment and protective coating of two FRP fan sets, including ceramic repair, epoxy coating and blade weight balancing.

Nakhon Ratchasima: Six-Blade FRP Fan Refurbishment
Refurbishment of a six-blade 6,240 mm fan set with ceramic repair, epoxy coating, blade balancing, hub coating and stainless root-cap/fastener replacement.

Six-Blade FRP Fan Reconstruction and Balancing
Reconstruction, protective coating and balancing of a six-blade cooling-tower fan set.

Rayong: Ten-Blade Fan Coating and Hub Fabrication
Protective refurbishment of ten fan blades combined with fabrication of two new HDGS fan hubs and SUS304 hub fasteners.
Drive shafts

Surin: CF60 425L Drive Shaft Coating and Alignment
Removal, coating, reinstallation and alignment of a CF60 425L cooling-tower drive shaft, followed by a test run.

Cooling Tower Drive Shaft and Gearbox Replacement
Drive-shaft replacement on two cooling-tower cells plus gearbox replacement on Cell A, alignment and vibration verification.

Ratchaburi: Composite Drive Shaft Replacement and Gearbox Inspection
Supply and installation of a composite drive shaft combined with gearbox inspection, alignment and vibration verification.
Preventive maintenance

Thailand: Eight-Unit Cooling Tower Preventive Maintenance
Annual preventive maintenance across eight cooling-tower units, integrating vibration spectrum analysis, alignment, lubrication and leak correction.

Songkhla: Three-Cell Cooling Tower PM and Mechanical Replacement
Three-cell shutdown scope combining preventive maintenance with motor, gearbox, hub, fan-blade and drive-shaft replacement on one cell and oil-seal replacement on two cells.

Rayong: Three-Cell Hydro-Fan PM and Gear Replacement
Three-cell mechanical-maintenance program with Hydro-Fan overhauls on two cells and gear replacement on a third cell.
Performance and airflow testing

Kanchanaburi: 12-Cell Cooling Tower Performance and Airflow Assessment
A 12-cell cooling tower assessment for the Kanchanaburi site combining thermal-performance testing, fan airflow measurement and engineering baselines.

Rayong: Cooling Tower Vibration Spectrum Analysis
One-cell vibration spectrum analysis to identify cooling-tower equipment exceeding vibration criteria and establish a diagnostic report.

Rayong: Multi-Block Cooling Tower Inspection
Cooling-tower PM inspection across multiple plant blocks covering drive components, structure, fill, nozzles, drift eliminators, fan geometry and alignment.
Green initiatives in action — 2025

- 20 kWp solar power system installed at the Rayong workshop.
- Solar power system installed at the Bangkok head office.
- 22,847 units per year of clean energy in the first year.
- 8.38 tonnes of CO2 per year in stated emissions reduction, equivalent to planting 11 trees per year.
- Paperless solutions and a company green policy.
Contact Synergy Services
Plan your next cooling tower project.
Send us the tower type, operating duty and current issue. We will help define the inspection, repair or upgrade path.
Synergy Services operates an ISO 9001:2015-certified quality management system and is a member of the Cooling Technology Institute (CTI).
Phone: 02-054-1402
Email: sales@synergyservices.co.th
Web: synergyservices.co.th
Contact our team · View / download corporate brochure · Download full company profile (PDF)
Scan for current details synergyservices.co.th/about/